Machine Downtime Calculation
This garments and industrial engineering guide is built for IE teams, line supervisors, and production planners.
Bangladesh-focused guide with practical calculation workflow.
Calculator in This Article
SMV Calculator
Calculate Standard Minute Value for garment operations. Essential for production planning and costing.
Line Efficiency
Calculate sewing line efficiency with all required IE fields: day production, SMV, manpower, working hours, and target/day.
Production Capacity
Calculate daily/hourly production capacity of a sewing line.
Pitch Time
Calculate pitch time for line balancing in garment manufacturing.
Step-by-Step Explanation
- Collect operation-time, manpower, output, and working-hour data accurately.
- Apply standard IE formula in the same method every day for consistent tracking.
- Use calculated values for target, balancing, and bottleneck decisions.
Formula
- Efficiency % = (Day Production × SMV) / (Manpower × Working Hour × 60) × 100
- Target/Day = (Manpower × Working Hour × 60 × Efficiency %) / SMV
Example Calculation
- If production is 2,400, SMV is 1.0, manpower is 50, and hours are 8, efficiency is 100%.
- Use the target/day formula to set realistic production commitment.
FAQ
- Which value impacts efficiency most? SMV accuracy and manpower deployment both matter.
- Should formulas be recalculated by style? Yes, each style should be measured separately.
Related Calculators
- /calculators/smv-calculator
- /calculators/line-efficiency-calculator
- /calculators/production-capacity-calculator
- /calculators/pitch-time-calculator
- /calculators/machine-productivity-calculator